Olympia Busbhanhof
At the former bus station at Olympiapark, this art installation reuses materials from the bus station, which had been unused for decades, and arranges them into a spatially effective work of art.
Location
Project location: Munich; Riesenfeld; Olympiapark; Lerchenauerstraße
Street segment: sidewalk and lanes (former bus station)
Project dimension: 1.250m2
Time
Project period: several years (24.06.2022 - vorr. 2024)
Project frequency: permanent
Actors
Initiators: Institution (Museum of Urban and Contemporary Art - MUCA), Company (Stadtwerke München GmbH)
Project makers: Professionals (Clemens Behr - Artist)
Construction
Space elements: Objects, Lighting
Material: metal, wood composites, glass (parts of the old roof construction)
Planting: none
Financing
Planning: Contract (Museum of Urban and Contemporary Art - MUCA, Stadtwerke München GmbH)
Production: Contract (Museum of Urban and Contemporary Art - MUCA, Stadtwerke München GmbH)
Material: Order (Museum of Urban and Contemporary Art - MUCA, Stadtwerke München GmbH)
Operation: Contract (Museum of Urban and Contemporary Art - MUCA, Stadtwerke München GmbH)
Approval format
Art installation
Planning context
Thematic planning context ★★☆☆
Location-specific planning context ★★☆☆
Use
Access: permanent, public
Target group: passers-by, participants (exhibition)
Program: art installation
Research sources
Own recordings of the authors
Internet: www.muca.eu/digital/installation-olympia-busbahnhof-muca (11/24/2022),
www.muenchen.de/veranstaltungen/installation-am-olympia-busbahnhof-muenchen (24.11.2022)
Authors
Philipp Endisch, Jessica Griesbauer, Vincent Wenk, Daniel Wolfram
Editorial revision
Felix Lüdicke, Gero Engeser, Katharina Dropmann
Publication/Status
06.12.2022