Here you can find current and completed projects and initiatives realised with in collaboration with Design Factory facilities. Some of the ongoing projects can be joined.
Bild: Yoshiyuki Kawaguchi, Neziha Ismail, Jumana Elamin / TUM
Computational design and fabrication 1
Factory: DF CC
Status: ongoing
Bild: Raphael Braham, Alice Morgane Fleury, Moritz Götzl / TUM
Project week - Computational design and fabrication
Factory: DF CC
Status: ongoing
Earth-additive manufacturing
Factory: DF CC
Status: ongoing
Timber-earth slab
Factory: DF CC - DF 1:1
Status: ongoing
Spatial AI for collaborative construction robotics
Factory: DF CC
Status: ongoing
Bild: Philipp Molter / TUM
Climate-award robotic envelopes
Factory: DF CC
Status: ongoing
Human-robot cooperative assembly
Factory: DF CC
Status: ongoing
Mobile robotics for additive manufacturing in construction
Factory: DF CC
Status: ongoing
Cooperative mobile brickwork
Factory: DF CC
Status: completed
Lox: collective AR-assisted assembly of topological interlocking structures